How we work

From the first drawings to the bore log – what happens at each stage and what you need to prepare.

  1. Stage 1

    We review the request and the route

    You send us the site plan, the profile (if available), pipe material and diameter. We check the route, the obstacles and the known geology, and visit the site where needed. The feasibility review is free.

  2. Stage 2

    Firm quote

    You receive a quote with price, schedule and what the client needs to provide (access, water for the fluid, the welded pipe, permits). No hidden costs.

  3. Stage 3

    Drilling plan

    We set the entry and exit points, the bore profile, the bend radii allowed by the pipe, the reaming stages and the drilling fluid recipe. For crossings we prepare the documents for permits.

  4. Stage 4

    Execution

    We mobilise the rig, drill the pilot bore with continuous guidance (DigiTrak Ares, Falcon F5+), ream in one or more passes and pull the pipe in a single operation. The work area is kept tidy and the drilling fluid is collected.

  5. Stage 5

    Handover

    We hand over the bore log with as-built depths and positions and, for gravity sewers, the as-built profile. Work pads are cleared and cleaned.

The rig at the entry point on the roadside
Execution: the rig at the entry point.
Pulling head emerging in the exit pit
Pullback in the exit pit.

Got a drilling job or a crossing?

Send us the drawings and get a firm quote. Feasibility review is free.

CallWhatsAppRequest a quote