Solar and wind farms need long cable routes across roads, canals and farmland. Drilling gets them in quickly, without disturbing crops or infrastructure.

PRO DRILL rig on a cable route along a fence
The rig on a cable route in open country.

Where we come in

  • Connection lines between the farm and the substation.
  • Crossings of national and county roads, railways and irrigation canals along the cable route.
  • Passes under farmland, tree belts and protected areas.

Why HDD

Developers work to fixed commissioning dates. Drilling reduces dependence on weather and land access along the whole route: we only work at the entry and exit points. Crossing permits are also easier to obtain when the method is drilling.

For developers and EPC contractors

We can join the project at study stage: we check the feasibility of the route, propose bore lengths and give a price you can use in the investment budget.

Frequently asked questions

Can you estimate costs at development stage?

Yes. Based on the preliminary route we give a budget estimate, then a firm quote once the design is final. You can also run a quick simulation with the calculator on hdd.ro.