Gravity sewers by HDD

Yes, gravity sewers can be installed by horizontal directional drilling. We track the grade in 0.01% steps along the whole length of each section.

Installing a manhole on a sewer route installed by HDD
Installing the manhole at the end of a drilled section.
PE pipes connected to a sewer manhole
PE pipes connected to the manhole.
In short: many designers and contractors assume gravity sewers can only be built by open-cut excavation. With the right equipment and method, a gravity main is installed by HDD between manholes, at the designed grade.

Why the grade matters

In a gravity sewer, wastewater flows only because of the slope. A deviation of a few centimetres along a section can create reverse slopes where sediment settles and, over time, blockages form. That is why the bore must be steered far more precisely than for a pressure pipe.

How we work

  • We start from the design profile and the invert levels of the manholes.
  • The pilot bore is steered and corrected continuously; the grade is read and tracked in 0.01% steps.
  • We ream and pull the pipe (PE, PVC or another approved material) between manholes.
  • At the end we hand over the as-built profile with measured levels.

Benefits for the client

  • No open-cut excavation in the streets – no asphalt to reinstate, no blocked access to homes.
  • Great depths without shoring – mains at 4–6 m without dewatering or trench support.
  • Speed – whole manhole-to-manhole sections in a single day.
  • Lower risk – no work in deep open excavations, so site safety improves.

Pressure and vacuum sewers too

Besides gravity networks we install rising mains and vacuum sewer networks – the right choice for flat areas. A current example is Otopeni, with about 15,000 m of vacuum sewer and 2,400 m of DN 280 pressure sewer.

Frequently asked questions

Can gravity sewers be installed by HDD?

Yes. With precision guidance and an adapted method, gravity mains are installed by HDD between manholes, with the design grade tracked in 0.01% steps.

What is the minimum grade you can drill?

We work to the grades in the design. Tracking precision of 0.01% lets us build the small grades designers use in flat areas.

How long is a section?

Usually the distance between two manholes – from a few dozen to over a hundred metres.

What do I receive at the end?

The as-built profile with levels measured along the route, ready to attach to the handover documents.

Related projects

Got a drilling job or a crossing?

Send us the drawings and get a firm quote. Feasibility review is free.