Horizontal directional drilling · Crossings · Relining

Horizontal directional drilling and trenchless crossings in Romania

Over 250,000 m of pipe installed in Romania since 2015. Under roads, railways and rivers – without stopping traffic and without digging up the asphalt.

PRO DRILL Vermeer rig drilling on the side of a street, with traffic flowing
Drilling at the roadside: the carriageway stays open to traffic.
250,000+ mof pipe installed by HDD
since 2015drilling across Romania
960 min one pull, under the Timiș river
~17 mworking depth
What we do

Trenchless services

We install and rehabilitate pipes and cables under obstacles for contractors, designers, utility operators, municipalities and energy developers.

Horizontal directional drilling (HDD)

Pipes and cables installed under obstacles without open-cut excavation, on a bore path steered in plan and profile.

Details →

Road, rail and river crossings

National and county roads, railways, rivers and irrigation canals – including the technical documents for permits.

Details →

Gravity sewers by HDD

Gravity sewer mains installed by HDD, with the grade tracked in 0.01% steps.

Details →

Pipe relining and rehabilitation

Old pipes rehabilitated from the inside, without digging them up.

Details →

Water and gas networks

Water and natural gas mains, distribution networks and service connections in PE or steel.

Details →

Fibre optic and power cables

Ducts for fibre optic networks and low, medium and high-voltage power cables.

Details →

All services

Few people know this

Gravity sewers can be installed by HDD

Gravity mains no longer require open-cut excavation along the whole street. We drill the sections between manholes and track the grade in 0.01% steps.

  • No street or pavement reinstatement
  • Great depths without shoring or dewatering
  • As-built profile handed over at completion
How we build gravity sewers
Sewer manhole with PE pipes connected after drilling
PE pipes connected to the manhole after drilling.
Why HDD

What you gain over open-cut excavation

No traffic disruption

The road, railway or street stays in service throughout the works.

No reinstatement

We only work at the entry and exit points. No carriageway to rebuild and no later settlement.

Short schedules

A road crossing in a day; hundreds of metres of pipe in a few days.

Easier permits

Road, rail and water authorities prefer – or require – drilling.

Projects

Recent projects

Some of the projects we are working on or have recently completed.

All projects

Vermeer D40x55 Navigator drill rig from the PRO DRILL fleet
Vermeer D40x55 – one of the rigs in our fleet.
Equipment

Rigs for long bores and for urban work

We run Vermeer drill rigs: from the Vermeer D220x330 Series II maxi-rig, used for the 960 m bore under the Timiș river, to the D40x55 and D24x40 rigs for work in towns and tight spaces. Guidance with DigiTrak Ares and Falcon F5+, fluid mixing with Vermeer MX125 and MX240.

See our equipment
Process

How we work

  1. Review

    We receive the drawings, check the route and visit the site where needed.

  2. Quote

    A firm quote with schedule and clear working conditions.

  3. Drilling plan

    Profile, entry and exit points, bend radii, drilling fluid.

  4. Execution

    Steered pilot bore, reaming and pipe pullback.

  5. Handover

    Bore log with as-built depths and profile.

Details on every stage →

Who we work for

Our clients

General contractors

We take on the drilling and crossings in network contracts as a reliable subcontractor.

Design firms

We check the feasibility of bore routes at design stage.

Utility operators

Water, sewer, gas, power and telecom.

Municipalities

Water and sewer networks without blocking the town's streets.

Renewable energy

Grid connections for solar and wind farms.

Telecom companies

Fibre optic ducts on long routes with many crossings.

Frequently asked questions

What is horizontal directional drilling?

A method of installing a pipe or cable underground between two points without open-cut excavation along the route: an electronically steered pilot bore, reaming, and pullback of the pipe.

How much does horizontal directional drilling cost?

Price depends on the diameter and number of pipes, length, ground conditions and mobilisation distance. For a quick estimate use the calculator on hdd.ro; for a firm quote, send us the project details.

Can gravity sewers be installed by HDD?

Yes. We install gravity mains between manholes by HDD, tracking the grade in 0.01% steps.

Do you work across Romania?

Yes. We are based in Bucharest and work anywhere in Romania. We have also worked in Germany.

How long can a bore be?

Typically up to 500 m in one pull; longer bores get a separate analysis. We completed 960 m in one pull under the Timiș river.

All questions →

Got a drilling job or a crossing?

Send us the drawings and get a firm quote. Feasibility review is free.

CallWhatsAppRequest a quote