Timiș river and archaeological site crossing – Șag
A 12-inch gas pipeline, 960 m in a single pull, under the Timiș river and an archaeological site, at a depth of about 17 m.
View case study →Over 250,000 m of pipe installed in Romania since 2015. Under roads, railways and rivers – without stopping traffic and without digging up the asphalt.

We install and rehabilitate pipes and cables under obstacles for contractors, designers, utility operators, municipalities and energy developers.
Pipes and cables installed under obstacles without open-cut excavation, on a bore path steered in plan and profile.
Details →National and county roads, railways, rivers and irrigation canals – including the technical documents for permits.
Details →Gravity sewer mains installed by HDD, with the grade tracked in 0.01% steps.
Details →Old pipes rehabilitated from the inside, without digging them up.
Details →Water and natural gas mains, distribution networks and service connections in PE or steel.
Details →Ducts for fibre optic networks and low, medium and high-voltage power cables.
Details →Gravity mains no longer require open-cut excavation along the whole street. We drill the sections between manholes and track the grade in 0.01% steps.

The road, railway or street stays in service throughout the works.
We only work at the entry and exit points. No carriageway to rebuild and no later settlement.
A road crossing in a day; hundreds of metres of pipe in a few days.
Road, rail and water authorities prefer – or require – drilling.
Some of the projects we are working on or have recently completed.
A 12-inch gas pipeline, 960 m in a single pull, under the Timiș river and an archaeological site, at a depth of about 17 m.
View case study →About 2,400 m of DN 280 pressure sewer and a vacuum sewer network of around 15,000 m, installed without open-cut excavation.
View case study →A single project with nine crossings of national roads, county roads, a railway and irrigation canals.
View case study →
We run Vermeer drill rigs: from the Vermeer D220x330 Series II maxi-rig, used for the 960 m bore under the Timiș river, to the D40x55 and D24x40 rigs for work in towns and tight spaces. Guidance with DigiTrak Ares and Falcon F5+, fluid mixing with Vermeer MX125 and MX240.
See our equipmentWe receive the drawings, check the route and visit the site where needed.
A firm quote with schedule and clear working conditions.
Profile, entry and exit points, bend radii, drilling fluid.
Steered pilot bore, reaming and pipe pullback.
Bore log with as-built depths and profile.
We take on the drilling and crossings in network contracts as a reliable subcontractor.
We check the feasibility of bore routes at design stage.
Water, sewer, gas, power and telecom.
Water and sewer networks without blocking the town's streets.
Grid connections for solar and wind farms.
Fibre optic ducts on long routes with many crossings.
A method of installing a pipe or cable underground between two points without open-cut excavation along the route: an electronically steered pilot bore, reaming, and pullback of the pipe.
Price depends on the diameter and number of pipes, length, ground conditions and mobilisation distance. For a quick estimate use the calculator on hdd.ro; for a firm quote, send us the project details.
Yes. We install gravity mains between manholes by HDD, tracking the grade in 0.01% steps.
Yes. We are based in Bucharest and work anywhere in Romania. We have also worked in Germany.
Typically up to 500 m in one pull; longer bores get a separate analysis. We completed 960 m in one pull under the Timiș river.
Send us the drawings and get a firm quote. Feasibility review is free.