Horizontal directional drilling (HDD)

We install pipes and cables under roads, rivers, buildings and sensitive ground without opening the surface. The bore path is steered electronically, metre by metre.

PRO DRILL drill rig at the entry point, with the PE pipe laid out along the route
Entry point: the rig and the PE pipe ready for pullback.

What horizontal directional drilling is

Horizontal directional drilling (HDD) installs a pipe or cable underground between two points without open-cut excavation along the route. The work is done in three stages:

  1. Pilot bore – the drill head, steered electronically, follows the designed path in plan and profile.
  2. Reaming – the pilot hole is enlarged with reamers to the diameter the pipe needs, while drilling fluid stabilises the bore.
  3. Pullback – the pipe, welded beforehand on the surface, is pulled into the reamed hole in a single operation.

When HDD beats open-cut excavation

  • The route passes under roads, railways, rivers, canals or buildings.
  • Traffic cannot be stopped and reinstating the road would cost more than the bore.
  • The surface must stay untouched: archaeological sites, green areas, yards, car parks.
  • The schedule is tight – hundreds of metres can be installed in a few days.
  • Groundwater is high and an open excavation would need costly dewatering.

What we install

NetworksDrinking water, pressure and gravity sewers, natural gas, fibre optic, low/medium/high-voltage power cables, protective sleeves
MaterialsPE (PE 100, PE 100-RC), steel, restrained-joint ductile iron, PVC-O, multiple cable ducts
Single-pull lengthTypically up to 500 m; longer bores after analysis – we have completed 960 m in one pull
DepthFrom 1–2 m for service connections down to ~17 m (Timiș river crossing, Șag)
DiametersFrom cable ducts to large-diameter pipes – for example 12" gas pipe
GuidanceDigiTrak Ares and Falcon F5+ locating systems; a bore log is handed over at the end

What you get from us

For every bore we prepare a drilling plan (profile, entry and exit points, bend radii allowed by the pipe), track the path throughout the job and hand over a bore log with the as-built depths. Drilling fluid is mixed with Vermeer MX125 and MX240 mixing systems to suit the ground – clay, sand or gravel – and handled in line with environmental rules.

Frequently asked questions

How long can a directional bore be?

It depends on diameter, material and ground. We typically drill up to 500 m in one pull; longer bores get a separate analysis. Our longest recent bore is 960 m, under the Timiș river.

How accurate is the bore path?

The drill head is located continuously and deviations are corrected on the go. For gravity sewers we track the grade in 0.01% steps.

What do you need for a quote?

The route (site plan), the longitudinal profile if available, pipe material and diameter, length and the obstacles to cross. The more complete the data, the more accurate the quote.

Do you work outside Bucharest?

Yes, we work all over Romania. Mobilisation is priced by distance from Bucharest.