Timiș river and archaeological site crossing – Șag
A 12-inch gas pipeline, 960 m in a single pull, under the Timiș river and an archaeological site, at a depth of about 17 m.
View case study →A single project with nine crossings of national roads, county roads, a railway and irrigation canals.
| Year | 2026–2027 – upcoming |
|---|---|
| Type of work | 9 crossings: national roads, county roads, railway, irrigation canals |
| Obstacles | Roads, railway, ANIF canals |
Nine different obstacles on the same route, each with its own owner and permit requirements: CNAIR, the county council, CFR and ANIF.
We plan all the crossings together, with technical documents for each permit and a single mobilisation of equipment along the route.
Project in preparation. The case study will be completed after execution.