Timiș river and archaeological site crossing – Șag
A 12-inch gas pipeline, 960 m in a single pull, under the Timiș river and an archaeological site, at a depth of about 17 m.
View case study →About 2,400 m of DN 280 pressure sewer and a vacuum sewer network of around 15,000 m, installed without open-cut excavation.
| Location | Otopeni, Ilfov County |
|---|---|
| Year | 2026 – in progress |
| Type of work | Pressure sewer and vacuum sewer |
| Pipe | PE DN 280 (pressure sewer) |
| Length | ~2,400 m pressure + ~15,000 m vacuum network |
Long networks in a town with heavy traffic and paved streets, where open-cut excavation would have blocked residents' access and required full road reinstatement.
We install the pipes by horizontal directional drilling in sections, working only at the entry and exit points. Vacuum sewers suit flat areas where a gravity network would need great depths.
Work in progress. Streets stay open to traffic throughout.
A 12-inch gas pipeline, 960 m in a single pull, under the Timiș river and an archaeological site, at a depth of about 17 m.
View case study →A single project with nine crossings of national roads, county roads, a railway and irrigation canals.
View case study →